Excavation and Support System for the Extension of Avia Power Station Loading Tunnel in Carballino

Designation of the Works

Excavation and Support System for the Extension of Avia Power Station Loading Tunnel in Carballino

Works Owner

Soluziona Ingeniería, S.A., Spain

Client

Obras Subterráneas, S.A.

Description

The works carried out mainly consisted of increasing the section of two tunnels to 6 m2, which are 270 m and 70m long respectively.

Location/Site

Carballino, Orense, Spain

Start Date

July 2006

Execution Period

2 months