Fetais Crushing Chamber

WORK Completion of Feitais Crushing Chamber, Excavation and Concreting of the Silos, Expansion of St.ª Bárbara Gallery and Reinforcement of the Gallery M 180 Designation of the Works Completion of Feitais Crushing Chamber, Excavation and Concreting of the Silos, Expansion of St.ª Bárbara Gallery and Reinforcement of the Gallery M 180 Works Owner Pirites Alentejanas, […]
Reconstruction of ER 201 Road

WORK Reconstruction of ER 201 Road Designation of the Works Reconstruction of ER 201 Road – Palheiro Ferreiro / Terreiro da Luta Works Owner RAMEDM – Estradas da Madeira, S.A. Client: Teixeira Duarte – Engenharia e Construções, S.A Description Execution of hydraulic crossings, reinforced concrete containment walls, embankments reprofiling, embankment containment, safety elements setting, road […]
Gondomar Line Mining Tunnel

WORK Execution of the West Side Entrance of the Gondomar Line Mining Tunnel – Dragão Football Stadium-Venda Nova Section Designation of the Works Execution of the West Side Entrance of the Gondomar Line Mining Tunnel Works Owner Metro do Porto, S.A. Client LGC – Linha de Gondomar Construtores, A.C.E. Description Railway Tunnel, 232 metres long […]
Construction of Seixo Alvo Tunnel, A32

WORK Construction of Seixo Alvo Tunnel ( A32 – Oliveira de Azeméis / IP1 ) Designation of the Works Construction of Seixo Alvo Tunnel ( A32 – Oliveira de Azeméis / IP1 ) Works Owner AEDL – Auto Estradas do Douro Litoral, S.A. Client Teixeira Duarte – Engenharia e Construções, S.A. Description Road tunnel with […]
Pipeline System of Porto Novo Gallery

WORK Pipeline System of Porto Novo Gallery Designation of the Works February 2012 Storm – Porto Novo Gallery Pipeline System – Consolidation of Water Pumping, Transformation Station and Flow Measurement Box Foundations Works Owner IGA – Investimentos e Gestão da Água, S.A. Client IGA – Investimentos e Gestão da Água, S.A. Description Execution of Supporting […]
Construction of Portela Lagoon

WORK Construction of Portela Lagoon Designation of the Works Construction of Portela Lagoon Works Owner IGA – Investimentos e Gestão da Água, S.A. Client IGA – Investimentos e Gestão da Água, S.A. Description The Contract Job comprised the construction of a lagoon and required the excavation and construction of a landfill wall in the body […]
Foz Tua Dam Tunnel

WORK Excavation and Containment of Provisional Derivation Tunnel and Access Tunnels, Charge Tunnels and Other Underground Structures of the Hydraulic Circuit of “Foz Tua” Dam. Designation of the Works Excavation and Containment of a Provisional Derivation Tunnel and Access / Charge Tunnels, Access Galleries at 55.90 height and for Raise-Boring, Galleries at 55,90 hight, Return […]
Cerro da Mina Reservoir

WORK Construction of Cerro da Mina Reservoir Designation of the Works Construction of Cerro da Mina Reservoir Works Owner SOMINCOR – Sociedade Mineira de Neves Corvo, S.A. Client SOMINCOR – Sociedade Mineira de Neves Corvo, S.A. Description Construction of a reservoir for the storage of residual water surplus resulting from the recirculation of the water […]
Watercourses System Recovery

WORK H05 Watercourses System Recovery Designation of the Works February 2010 Storm – H05 System Recovery (S. Vicente/S. Jorge) Works Owner IGH – Investimentos e Gestão Hidroagrícola, S.A. Client Teixeira Duarte – Engenharia e Construções, S.A. Description Irrigation Channel Recovery over 38 km, with the construction of hydraulic crossings Location/Site São Vicente, A. R. Madeira, […]
Estoril Coast Interceptor – 1st. Stage

WORK Construction of the Tunnels 6,7 and 8 of the Estoril Coast Interceptor – 1st. Stage Work Designation Construction of the Tunnels 6,7 and 8 of the Estoril Coast Interceptor – 1st. Stage Owner Costa do Estoril Sewage Disposal Office Client OPCA – SOMEC Consortium Characterization Construction of the Tunnels 6,7 and 8 which integrate […]