Foz Tua Dam Tunnel

Foz Tua Dam Tunnel

WORK Excavation and Containment of Provisional Derivation Tunnel and Access Tunnels, Charge Tunnels and Other Underground Structures of the Hydraulic Circuit of “Foz Tua” Dam. Designation of the Works Excavation and Containment of a Provisional Derivation Tunnel and Access / Charge Tunnels, Access Galleries at 55.90 height and for Raise-Boring, Galleries at 55,90 hight, Return […]

Cerro da Mina Reservoir

Cerro da Mina Reservoir, Castro Verde

WORK Construction of Cerro da Mina Reservoir Designation of the Works Construction of Cerro da Mina Reservoir Works Owner SOMINCOR – Sociedade Mineira de Neves Corvo, S.A. Client SOMINCOR – Sociedade Mineira de Neves Corvo, S.A. Description Construction of a reservoir for the storage of residual water surplus resulting from the recirculation of the water […]

Excavation and Support System of Anillo Power Station Loading Tunnel

Excavation and Support System of Anillo Power Station Loading Tunnel

WORK Excavation and Support System of Anllo Power Station Loading Tunnel Designation of the Works Excavation and Support System of Anllo Power Station Loading Tunnel Works Owner Soluziona Ingeniería, S.A., Espanha Client Obras Subterráneas, S.A. Description Hydraulic Works – section: 10 m2. Tunnel 1500 linear metres long. Location/Site River Lérez, Cotobade and Campo Lameiro, Pontevedra, […]

Watercourses System Recovery

Watercourses System Recovery, Madeira

WORK H05 Watercourses System Recovery Designation of the Works February 2010 Storm – H05 System Recovery (S. Vicente/S. Jorge) Works Owner IGH – Investimentos e Gestão Hidroagrícola, S.A. Client Teixeira Duarte – Engenharia e Construções, S.A. Description Irrigation Channel Recovery over 38 km, with the construction of hydraulic crossings Location/Site São Vicente, A. R. Madeira, […]

Estoril Coast Interceptor – 1st. Stage

Interceptor da Costa do Estoril - 1ª fase

WORK Construction of the Tunnels 6,7 and 8 of the Estoril Coast Interceptor – 1st. Stage Work Designation Construction of the Tunnels 6,7 and 8 of the Estoril Coast Interceptor – 1st. Stage Owner Costa do Estoril Sewage Disposal Office Client OPCA – SOMEC Consortium Characterization Construction of the Tunnels 6,7 and 8 which integrate […]

Power Reinforcement of Salamonde

Power Reinforcement of Salamonde , Vieira do Minho

WORK Construction of Power Reinforcement of Salamonde – Salamonde II Designation of the Works Construction of Power Reinforcement of Salamonde – Salamonde II Works Owner EDP – Gestão da Produção de Energia, S.A. Client EDP – Gestão da Produção de Energia, S.A. Description Installation and monitoring of all the geotechnical and topographic instrumentation. 62 surface […]

Vila Franca de Xira Water Feeder (Trunk Main) Tunnel

Water Feeder (Trunk Main) Tunnel, Vila Franca de Xira

WORK Vila Franca de Xira Water Feeder (Trunk Main) Tunnel Designation of the Works Construction of the Tunnel – Duplication of Castelo de Bode Water Feeder (Trunk Main) between Quinta da Marquesa and Vila Franca de Xira Station Works Owner EPAL – Empresa Portuguesa das Águas Livres, S.A. Client Mota-Engil and MSF Consortium Description Excavation […]

Loural Tunnel

Loural Tunnel, Madeira

WORK Execution of Loural Tunnel Works Owner Execution of Loural Tunnel Works Owner IGA – Investimentos e Gestão da Água, S.A. Client IGA – Investimentos e Gestão da Água, S.A. Description Construction of an hydraulic tunnel approximately 319 m long and an excavation section of 5,2 m2 for ZG3a and 5,9 m2 for ZG4a, with […]

Construction of the Water Intake

Construction of the Water Intake, Alvito

WORK Construction of the Water Intake on the Left Bank of Alvito Reservoir Designation of the Works Construction of the Water Intake Works Owner EDIA – Empresa de Infraestruturas e Desenvolvimento do Alqueva, S.A. Client EDIA – Empresa de Infraestruturas e Desenvolvimento do Alqueva, S.A. Description Contruction of a 213 m long mining tunnel using […]